Current News Period of 15 Jul 2007 to November 3 2007
Through July and August we continued concentrating on re-establishing production on our Scovel, Holland and Sheets Leases. The disposal well and salt water pump was repaired on the Scovel Lease. We pulled wells and restored the Wayside Sand production on the Holland Lease. And we were diligent in maintaining production on the Sheets Lease. We had been waiting a long time for Sheets 23 to start producing oil again, and in August after 9 months of pumping came back on production at 4 BOPD.
Personally I determined to start working 7 days per week and cut out as many distractions from my life as possible. And that's about it, I have been working my tail off, keeping the extra-curricular activities to a minimum.
We are currently working as much as possible on establishing production on the Sanders Lease as we are facing an expiry situation there. We are back logged on production projects on the Khan, Anderson B and Drummer Leases as well. There never seems to be an end of things to do. But I'll just keep doing.